CN
Overview Downloads Related Case Related Products
  • ADS
  • ADS
  • ADS
  • ADS
  • ADS

ADS

ADS is an ultra-thin (38 mm), lightweight double-sided LED display designed for easy hanging or stacking installations, delivering high brightness, 7,680 Hz refresh rate, and ultra-low power consumption. It is optimized for airports, shopping malls, creative retail, and exhibition displays, offering stable images, high contrast, and front-and-rear maintenance.

  • Pixel Pitch: 1.8mm/2.5mm/2.9mm/3.9mm
  • 10,000:1 Contrast Ratio
  • 7680Hz refresh rate
  • 328 w/m²

Airports / Shopping Malls / Creative Retail / Exhibition Displays

  • ADS

    Thickness: 38 mm

  • ADS

    7,680Hz Refresh Rate

  • ADS

    328 w/m²

  • ADS

    10,000:1 Contrast Ratio

38mm Double-Sided Display Ultra-Thin Design

Breaks single-screen limits with dual-view technology

56.5% High Energy Efficiency

Shared rear-housing dual-side design, only 328 w/m² power consumption – 56.5 % less than traditional displays

Low Magnetic Emission Technology

Reduces crosstalk and flicker for stable images

Hanging | Stacking

Lightweight structure supports hanging and stacking mounts

Documents & Downloads

  • ADS Series

Related Case

  • Orion EMN Digital Studios
    Case Study

    Orion EMN Digital Studios

    Located in the bustling heart of Istanbul, the EMN XR Studio is Turkey’s leading virtual production facility, covering an impressive 6000m². This spacious studio features four independent shooti…

    View More Next
  • Vanke Mall
    Case Study

    Vanke Mall

    Vanke Mall in Wuhan, Hubei, uses AOTO’s GC2.5TC, IF2.9, P3.9, and U1.2 series displays in key areas. These include column screens, corner screens under the stairs, transparent screens in the main atri…

    View More Next
  • Television StationMTV News Studio
    Case Study

    Television StationMTV News Studio

    In the Lebanon MTV News Studio upgrade project, AOTO successfully deployed nearly 300 high-performance display cabinets, including multiple CVES1.2,curved C1.8 screens, and specially customized units,…

    View More Next
  • Metro Xiawafang Station
    Case Study

    Metro Xiawafang Station

    At Tianjin Metro Xiawafang Station, AOTO custom-installed two C1.8 series displays with a total area of 34.56 square meters. The displays feature a streamlined, curved design, perfectly integrating wi…

    View More Next
  • Portugal’s largest outdoor LED display Lisboa Gate project
    Case Study

    Portugal’s largest outdoor LED display Lisboa Gate project

    AOTO Electronics has teamed up with Grupo DREAMMEDIA to successfully create Portugal’s largest outdoor LED display for the Lisboa Gate project. Its unique wave-shaped structure has become a majo…

    View More Next
  • Sky TV
    Case Study

    Sky TV

    As the 2017 Bundesliga season kicked off, Sky Sport’s new headquarters in Unterföhring ocially commenced full oSport’sns. AOTO’s displays were chosen for their outstanding performanc…

    View More Next
  • Hangzhou Xiaoshan International Airport
    Case Study

    Hangzhou Xiaoshan International Airport

    AOTO is honored to be again involved in upgrading Hangzhou Xiaoshan International Airport. To enhance the airport’s modernization and technological appeal, AOTO installed large-sized facade scre…

    View More Next
  • Four Seasons Hotel
    Case Study

    Four Seasons Hotel

    At the FS Hotel in Singapore, AOTO’s U2.5 LED displays create a breathtaking visual experience with a combination of a main screen and ceiling screens. The main display, consisting of two large …

    View More Next

Related Products

  • CV MIP Series

    CV MIP Series

  • CV MINI Series

    CV MINI Series

  • U Series

    U Series

  • CB Series

    CB Series

Leave a Message

Thank you for your attention and support for AOTO. We will get back to you promptly upon receiving your message.

  • Name*

  • Phone*

  • Country/Region*

  • Company*

  • Where do you know AOTO from*

  • Message*